https://rachelmarquette.typepad.com > kitchen

« Back to kitchen

10

10

waiting. we had to special order this window- the 1st one was cracked -so another 10 days. Add insulation to the walls. And see that cotton ball stuff at the top of the studs? blown in insulation. gross stuff. we had to shop vac it out. When this ceiling came down this week - we all got sick with sinus infections. I say it had something to do with all this exposed stuff that was in our attic. eddie says it was just a coincidence. hmmm.

Permalink